AiLond · Copper Fox Metals · Eaglehead Cu-Mo-Au, northern BC · 1 Nov 2026

Eaglehead: Drill Plan vs AI

Where Copper Fox plans to drill next, compared with where AiLond's AI model points, on top of all 126 historical and modern drill holes. Use the buttons to switch views, hover for detail, and use the drill-data panel to filter intercepts by metal and grade.

99.7AI score at Copper Fox's Phase 1 target, the East–Bornite gap (top 0.3% of the map). The plan and the AI agree.
Same trendCopper Fox's IP anomaly is open to the NW of Camp; AI target T1 lies 2 km further NW on the same contact.
3 areasAI targets at the SE end of the corridor (T2, T5, T6) that are not in the company's plan.
2D onlyThe AI ranks ground at surface. Copper Fox's deep targets (Phase 2) need the IP sections to judge.

3D view on real terrain

Drag to rotate, scroll to zoom. Surface colour = AI score. Grey lines = drill holes; coloured bars = intercepts (default ≥0.2% Cu). Pink = Copper Fox targets; blue = AI target areas. Vertical exaggeration about 4×.

Map view

Green dots = holes with ≥0.2% Cu over ≥10 m; grey = weak; open circles = no public grades. Dashed pink = Copper Fox Phase 2 / follow-up areas; solid pink and star = Phase 1.

Ground by ground

GroundCopper Fox planWhat drilling showsAI findingVerdict
East–Bornite gapCF-1 · Phase 1 · 4 holes, 2,500 m, drilled to the SW. Company's stated next step (Aug 2026).Untested ~500 m between the two drilled zones; IP chargeability continues across the gap.AI score 99.7 – inside the top 0.3% of the map. The model sees the gap as the same ground as Bornite and East.Plan and AI agree
Deeper East & Bornite, deeper PassCF-2 / CF-3 · Phase 2 · 6 holes, 3,000 m, after Phase 1.2014–15 holes DDH121–126 carried mineralisation to 440–620 m depth.Surface scores 97–100, but this AI model is two-dimensional. It cannot judge depth; IP sections are the better guide.AI can’t judge depth
Camp zoneCF-4 · Phase 2 · systematic re-drilling, 8 holes, 2,800 m, including Titan24 IP targets.1970s holes only; collar positions ±10–50 m and few public assays.AI score 99.2. Agrees the Camp ground belongs to the corridor.Plan and AI agree
North-west of Camp / WestCF-5 · IP anomaly open to the NW (Aug 2026 presentation). No drilling proposed yet.Only one hole (DDH057, West zone).AI target T1 (287 ha) sits a further 2 km NW on the same fault–intrusion contact. Both point the same way; T1 is the AI's top new area.Plan and AI agree
South-east end (Far East / Pope)Not in the plan; 43-101 suggests extending IP over the Far East zone.8 holes 2006–08; DDH066 cut 31 m @ 0.27% Cu; DDH095 weak in Cu.AI targets T2 (81 ha), T5 and T6 continue the corridor 1–4 km beyond the last holes.New – AI only, check on ground
Far north-west (6–7.5 km out)Not in the plan.Never drilled.AI targets T3, T7, T8 – reconnaissance only; T7 is on open ground at the edge of the data area.New – AI only, check on ground